EN 1090-2 EXC3 · ISO 3834-2 · Certified by EUROCERT
Not a trading company. A works that can build to European standards.
Six H-section lines, two heavy-structure lines, robot and submerged-arc welding, 160 machines. 32 export projects delivered to 14 countries. We fabricate to your drawings.
Valid until 13 Mar 2028
Valid until 13 Mar 2028
160 machines
Thailand is our deepest market
Contractor, Grade II · D232579962
What we fabricate
Four lines, one works, one certificate
Pre-engineered building suppliers are built around standard portal frames. Pipe racks, plate hoppers and sculptural steel are not standard, which is why they usually get split across two vendors. We fabricate all of it in the same works, under the same execution class.
Why the execution class matters
Most tenders that specify EN 1090 rule out Chinese fabricators at prequalification.
Across Southeast Asia, the Middle East and Africa, plant and infrastructure work is frequently designed by European consultants and tendered to EN standards. That normally leaves a buyer two options: a European fabricator at European prices, or a Chinese fabricator that cannot clear the compliance review.
Our EN 1090-2 certificate is issued by EUROCERT in Greece and states execution class EXC3, the class the standard requires for bridges and other high-consequence structures, not the EXC2 that covers ordinary buildings. It is audited annually under system 2+, and you can verify it with EUROCERT directly rather than taking our word for it.
Export project ledger
What we have actually delivered, line by line
32 export projects across 14 countries, roughly 12,337 tonnes. For any line on this list we can tell you the scope we fabricated and the drawings we worked to. Markets we have not worked in are not on this page.
| Project | Country | Tonnage | |
|---|---|---|---|
| Iligan Fly-Ash Retrofit Project | Philippines | 2,000 t | |
| BYD Türkiye Project | Türkiye | 1,050 t | |
| Zeas Project Ancillary Buildings | Mexico | 1,016 t | |
| BYD Cambodia Project | Cambodia | 980 t | |
| Hainaway Project | Egypt | 966 t | |
| TPV Thailand Project | Thailand | 952 t | |
| BYD Indonesia Project | Indonesia | 766 t | |
| Commercial Centre Steelwork | Mauritius | 500 t |
Showing the eight largest by tonnage. See all 32 export projects →
Inside the works
Cutting, milling and welding under one roof
Six H-section production lines, two heavy-structure lines, welding robots, laser and plasma cutting, CNC flame cutting, end milling, section straightening, shot blasting and coating. 160 machines in total, rated at 50,000 tonnes a year.